86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Tangshan polar bear building materials co.,ltd

Products >> Ground Self-leveling material

Ground Self-leveling material

Build Your Online Product Catalogs?



Description
Product Name: Ground Self-leveling material
Supply Ability:
Related proudcts floor, ground, self-levelling,
Specifications It is a flooring self-leveling material.
Price Term: FOB,CNF,CIF
Port of loading: tianjin
Minimum Order 1 Tonne/Tonnes
Unit Price:

Polar Bear cementitious self-levelling materials consist of a blend of selected cements, superplasticizer, and aggregates modified with polymers and flow agents. It is used in conjunction with Polar Bear Primer. Polar Bear cementitious self-levelling materials are supplied as pre-blended powder which requires only the addition of water on site to produce a self smoothing, free flowing material. These materials are designed for installation by a continuous mixer pump, but can also be applied by hand.
Technical Specification
Table 1 Specification of Polar Bear Self-levelling Materials

CSA-I*
CSA-II
CSA-III

Setting Time
I.S., min
60~90
60~90
60~90

F.S., min
90~120
90~120
90~120

Compressive Strength (***),� 1d
13
10
8

7d
20
20
15

28d
35
30
20

Drying Shrinkage,%
<0.05
<0.05
<0.05

Bonding Strength(***),>
1.0
1.0
1.0

Flow
Initial
130~150 mm

After 20min
130~150 mm

Working Life
�0min

Application Temperature
5 ~40 °C

Walk-on time
2 ~ 3 h
3 ~ 4 h

Time to overlaying
1~2d
1~3d
1~7d

W/P ratio
0.18
0.18
0.20





Application Instructions
Preparation
1.The substrate should be clean, sound and free from loose material and contamination such as plaster, oil, paint and grease. The substrate should have a compressive strength of at least 20*** and a surface tensile strength of at least 1*** (pull-off strength).
2.Excess laitance should be removed by mechanical methods followed by vacuuming and water cleaning to remove dust debris.
3.Oil and grease can be removed by chemical ***ergent followed by water cleaning.
4.New concrete should be at least 14 days old.
5.In case of porous substrate or hot weather, the substrate should be ponded with clean water for 1~3 hours before priming.
Priming
The object of priming is to seal the substrate to prevent air release from the subfloor rising and forming bubbles and pinholes on the surface. Extremely porous substrates ma

Contact Us
Company: Tangshan polar bear building materials co.,ltd
Contact: Ms. lulu pan
Address: bldg1,commercial mall,li yuan village,li yuan,tong zhou dist.
Postcode: 101101
Tel: 86-15810182402
Fax: 86-10-60557306
E-mail:         


Copyright© Tangshan polar bear building materials co.,ltd All Rights Reserved.
Tel : 86-15810182402 Fax : 86-10-60557306
Powered by 86exporter.com